RE: my June 12 post...We went ahead and had the attic sprayed with a Soy-based product. Stayed in a hotel for 3 nites. Still smelled a little bad but that's gone away over time. I'm very glad we didn't use the other foam as even that much outgassing of a petrochemical could have sent my wife to the hospital. Unfortunately, the spray crew didn't speak English(at least not to me) and were kinda lazy, so they ended up spraying over some can fixtures from the kitchen below that were not insulation-contact rated. So I hired an electrician to come out, pull down the cans, pull out what he thought was an appropriate amount of foam to create a big enough air space and then re-install the cans. I billed the firm for the electrician plus an extra night we had to stay in the hotel and they paid, no questions asked. Guess they knew they had screwed up.  
I have to insulate my walls at the end of this week. That does not give me time to procure slow-rise foam, so my stud cavities will be filled with foam before I'm ready to fill the corner voids. I will not be able to drill straight through the corner studs. Instead, I will have to remove material where the studs meet. What sort of tool do you envisioning me holding while I create space to pump foam into my 1972 corner voids?
I recently did a remodel project for my basement using spray foam insulation. The original builder has used fiberglass, but I wanted the best insulation i could find. We chose closed cell foam because it blocks moisture from getting into the house. It took one day to install and was fumey for about 3 hours. It was pretty cool watching it being done. It comes out as a liquid and then expands rapidly into a foam. It's quick! Then they took a types of saw to shave it flat with the wall studs so we could then go ahead and drywall.

Roof Coating Denver Colorado

×